Qingdao G&Z Trading Co.,Ltd

Contact US

Address: Room 2901, Bldg 1, Zijin Plaza, Qingdao E&T Development Zone, Shandong 266555, China

TEL: +86-532-80980931

FAX : +86-532-80980932

Mobile: 0086 13963970719 (whatsapp number)

Email: ziwei@gzcngroup.com

Website: http://www.gzcnmachinery.com/

               www.gzcngroup.com 

Home > News > Content
Super Quality Hot-Sale Semi Automatic Carton Folder Gluer
- Jun 24, 2017 -

Basic Info

  • Model NO.: FDF-800

  • Automatic Grade: Automatic High-Speed Folder Gluer

  • Packaging: Wooden

  • Service Machinery Overseas Product: High Speed Paper Gluing

  • Max Paper Width: 600mm

  • Transport Package: Wooden Case

  • Origin: qingdao

  • Type: Ditch Folder Gluer

  • Driven Type: Electric

  • Voltage: AC220V 3.5kw

  • Feeding Way: Automatically and Continuously

  • Trademark: FINENESS

  • Specification: 5800*900mm*1300mm

  • HS Code: 7607119000

Product Description

Our company official website: www.fitlifemac.com 

Specifications 
 
High speed paper gluing machine  FDF-800A model possesses the FDF-800 Folder gluer all functions, Use of imported electrical appliances, and accessories for export with a rubber roller .Paper can be pressed together by the processes as well as possesses the features of beautiful modeling, high speed and can made more wide boxes etc.Which can paste and manufacture from Widely uses in paste process for medicine box, wine box, cosmetics box and electric equipment package etc., It's essential equipment in packing printing industry.  
 
FDF-800A Features:
 
1,Line speed: 0-220m/min adjustable
2,Paperboard:210-600g/m2 paperboard
3,box forming:one side and two sides gluing
4,paper board feeding: auto continuous feeding
5,glue type: cold glue
6,power:single phase .AC220V,2.2KM
7,WEIGHT:1800KG
8;Dimension:5800*900mm*1300mm
9,counting range:0-999999(fully automatic,including batch counting)
 

Packaging Detail:Steel package suitable for long-distance transport shipping and The machine can be stacked up save the cotainer room .
Delivery Detail:According to the contract delivery time about 10 to 15 days .